.@bloomingdame I lied. This is 3 of 3. Need 40+ temps for a couple days straight for contractor to do restoration. #BloomingdaleDC
.@bloomingdame However, restoration of the roadway has been delayed by the weather and spike in breaks. #BloomingdaleDC (2/2)
.@bloomingdame Water main replacement on 2nd St NW north of RI Ave has been completed. #BloomingdaleDC (1/2)
No comments:
Post a Comment