I don’t anticipate that either the master plan or the WASA infrastructure project will be heard by HPRB this month.
Steve Callcott
Deputy Preservation Officer
Historic Preservation Office, DC Office of Planning
1100 4th Street, SW, Suite 650-E
Washington, DC 20024
So McMillan might be pushed to the January 2013 HPRB hearing. Stay tuned.
1 comment:
I assume the plans for mcmillan need to be rethought to include the medical center/flood relief? The city should be more transparent as to why they keep pushing back.
Post a Comment