Friday, July 19, 2013

DC Water: pre-construction survey coming up; construction staging area map for Flagler/Adams NW

See below:


From: Emanuel D. Briggs <Emanuel.Briggs@dcwater.com>
Date: Thu, Jul 18, 2013 at 7:50 PM
Subject: RE: First Street Tunnel Project-Upcoming Meetings
To: 
Cc: Andrea Williams <Andrea.Williams@dcwater.com>, Elizabeth Weaver <Elizabeth.Weaver@dcwater.com>, Beth Weaver <eweaver@dpconsultants.net>, Jill McClanahan <Jill.McClanahan@dcwater.com>

Pre-construction surveys are expected to begin by next month at the latest, preceding construction activities. You can expect to receive paper work in the mail and once you have read and agreed to the terms and conditions of the survey, you can contact DC Water and we will schedule your survey at your convenience.
           
Attached please find a slide depicting the final construction staging area boundaries. As you may recall, during our June 19 meeting, we explained that we were actively involved in collaboration with three Design Build contractors. Based on those collaborations, we plan to move forward with the smaller footprint. The duration of construction for Adams/Flagler remains at 18 months.
   
On Adams St. the staging area should approximately end at 140 Adams St. (West of Flagler) and 122 Adams St. (East of Flagler).
                              
Thank you for your questions and comments.
   
Emanuel D. Briggs | Manager, Community Outreach, External Affairs | District of Columbia Water and Sewer Authority | emanuel.briggs@dcwater.com
5000 Overlook Avenue, SW | Washington, DC 20032 | (202) 787-2003 |(202) 787-4122 (fax)
Water is Life! | Web | Facebook | Twitter | YouTube | Flickr
                

1 comment:

Scott Roberts of Bloomingdale said...

I assume that similar DC Water construction staging area maps have been produced for 1st & V St NW and 1st & Thomas St NW.