Sunday, December 29, 2013

pay attention! 1st St NW between Channing and Michigan Av NW C L O S E D ALL WEEK (tell your friends who commute using 1st St NW)

Here is a refresher of a Christmas Eve message from DC Water regarding THE COMPLETE CLOSURE OF 1ST ST NW BETWEEN CHANNING AND MICHIGAN AVENUE NW starting tomorrow, Monday, 12-30-2013.



From: Emanuel.Briggs@dcwater.com
To: Emanuel.Briggs@dcwater.com
CC: Emanuel.Briggs@dcwater.com
Subject: RE: Traffic Advisory: McMillan Construction Brings Traffic Impacts to First Street (Updated for Week of December 30)
Date: Tue, 24 Dec 2013 17:30:40
  
DC Water Contact:
Emanuel D. Briggs
Manager, Community Outreach
(202) 787-2003



December 24, 2013

Traffic Advisory
McMillan Construction Brings Traffic Impacts to First Street
                             
(Washington, DC) – DC Water is performing construction activities on First Street, NW as part of the McMillan Stormwater Storage Project.

During the week of Monday, December 30, First Street between Channing Street and Michigan Avenue will be completely closed to both northbound/southbound traffic. It is advised that North Capitol Street be used as an alternative route for travel on First Street.

Important Information:
  • Construction operations for all partial road closures will be from 7:00am to 7:00pm, Monday through Friday; construction operations for all full road closures will be 24 hours, Monday through Saturday.
  • Temporary traffic signs will be set up throughout the area to alert motorists to the upcoming traffic changes.
  • Some traffic delays within the vicinity of the work zones are anticipated.
  • Sidewalk detours will also be implemented.
  • There will be an increase in truck traffic.
  • Noise levels will be closely monitored during construction.   
                                                                                                                  
Project Details
DC Water will construct two underground structures to divert stormwater into a temporary holding tank within the McMillan Sand Filtration Plant and existing trunk sewer.  The two diversion structures at North Capitol Street and First Street will work together with the retention basins along Irving Street to delay approximately 4.5 million gallons of stormwater from reaching the Bloomingdale and LeDroit Park neighborhoods during heavy rainfall events. 
    
This is a two-phase project.  The first phase, completed in 2013, included removal of sand from two tanks.  The second phase of the project is currently underway, and includes work on North Capitol Street, First Street and Irving Street.
   
###

1 comment:

TheCommiss said...

Can we get signs at RI and First ST NW to get traffic to divert on to RI then N. Cap instead of a side st being used as the detour ????