Showing posts with label U Street NW. Show all posts
Showing posts with label U Street NW. Show all posts

Monday, April 09, 2012

drug use on the Unit Block of U Street NW

From a resident who lives near this area:

I was wondering if you might pass this on to the community so other folks nearby can keep their eyes out for similar activity and report to the police - especially considering this happened at 9am on a Sunday morning!

Easter Sunday, around 9:00am on the Unit Block of U Street, I was outside and noticed an out-of-place-looking white couple digging through an older red pickup truck. When I went inside, I pointed them out to my husband and we kept our eye on them. After about 15-20 minutes my husband saw them sitting in their truck, smoking something through a little glass tube. At that point I called the police and described what we`d seen and gave a description of the car. About 10 minutes later a cop car drove by but didn`t stop. The couple immediately drove off. Later, we were outside and found a tiny ziplock bag next to where the truck had been parked. I was glad the couple left, and encouraged that the police responded to the call but disappointed that the police didn`t take any action. It seems possible that the source of the drugs is nearby. This is not the first time we`ve noticed suspicious drug-related activity, though it is the first time we`ve seen obvious drug use.


What`s the best way to work/communicate with the police to address such activity?

Saturday, October 23, 2010

repaving of Flagler Place & the 100 block of U Street to start Monday; street sweeping suspended

From ANC 5C04 Commissioner John Salatti:

I have attached a letter that was hand delivered yesterday to all of Flagler Place; the 100 blocks of U, V, W, and Adams Streets; and the 2100 and 2200 blocks of 1st and 2nd Streets NW. However, I am sending the letter to be posted so others in the neighborhood are aware of this project and the impacts it may have. To limit the impact on parking, DC Water and I requested that DPW suspend street sweeping this coming week on all the blocks were the letter was delivered. DPW readily agreed to help out. So people should be able to park anywhere this coming Monday and Tuesday. The goal is to give residents maximum flexibility to park while the streets are being repaved.

Thanks for posting this information.

John
--
John T. Salatti
Commissioner, ANC 5C04
(202) 986- 2592
John.Salatti@gmail.com
``Together, Building a Better Bloomingdale``


October 22, 2010

Dear Neighbors:

The final phase of the Flagler-U water line replacement project gets under way next week with the affected blocks being milled and repaved. This work will start this Monday and run through Wednesday with the work day going from 7:00 a.m. to 5:00 p.m. Of course, this schedule is dependent on the weather; I note that the forecast is for a few showers on Monday and scattered thunderstorms on Tuesday. I have asked DC Water and its contractors, if bad weather suspends work, to notify Parking Enforcement that no work is going on that day so that residents can park without fear of tickets.

Each day only a piece of the entire project area will be worked on. The current schedule is as follows:


• Monday: the 2200 block of Flagler and the intersection of Flagler and Adams
• Tuesday: the 2000 and 2100 block of Flagler
• Wednesday: the 100 block of U Street and the intersection of Flagler and U

Of course, parking is our biggest concern. Here is what you need to know about parking.
• On the block(s) that are being worked on any one day, no parking will be available during work hours.
• You can park on the other blocks in the project area without incident.
• After work ends at 5:00, you can park, for the most part, on the block or blocks that were part of that day`s work. Each section should be milled and paved completely in one day.
• To abide by the rule requiring contractors to give residents 72 hours` notice before restricting parking, No Parking signs should appear on the all along Flagler Place and around the intersection of Adams and Flagler today letting you know that parking on that block and around the intersection will be restricted on next week.
• To ease parking problems, DC Water and I have asked DPW to suspend street sweeping operations next week on the 100 blocks of Adams, W, V, and U, and the 2100 and 2200 blocks of 1st, 2nd, and Flagler. DPW agreed. Thus, you can park on either side of all those streets Monday and Tuesday of next week without getting a ticket. If for some reason you get one, please let me know and I`ll get it waived.
• If any one needs to get their vehicle out of the way for those days next week, I have secured 10 off-street parking spaces in the neighborhood in the north part of the work area and 10 in the south part of the work area. If you`d like to have your car parked off the street on the day work is happening on your block, please let me know. Spots are available to people on a first-come, first served basis.

Hopefully, by Wednesday, all this will be over and we`ll have a few quiet months. You all have done a great job of making this project go smoothly and working with the disruptions. I applaud you. Contact me if you have any questions or concerns.

Always at your service,
John Salatti,
Commissioner

Monday, September 21, 2009

WASA work coming up for Flagler and U St NW

See this 09/19/2009 message from ANC 5C04 Commissioner John Salatti.


DC WASA will be doing a water line and lead pipe replacement project on Flagler Place NW and half of the 100 block of U Street NW. The agency is currently seeking a permit to start work, and the starting date will be directly a factor of when DCRA issues the permit. The project will start at Adams and come down Flagler and turn left on to U Street and end at 1st NW. The project will proceed one block at a time to minimize the parking problems that are going to result from this work. The typical work day will run from 7:00 am to 7:00 pm. This will make parking much more problematic, but will allow the agency to get the work done in half the time. But even with this work day, each block on Flagler will take 45-50 days to complete.

None of this water project will impact the 100 block of V Street or 2nd Street NW.